What is a mining farm and how does it work

A mining farm is not just a single device but an integrated system of computing equipment that operates continuously to validate blockchain transactions and earn cryptographic rewards. In the early days of cryptocurrencies, a regular personal computer was sufficient, but current conditions in 2025 require specialized profile equipment to achieve profitable results.

The principle of operation is simple: the participant provides computational resources to the network, performing cryptographic operations. In response, the network awards rewards in the form of newly created coins and transaction fees. Therefore, a mining farm is a specialized complex built on two main types of devices: graphics processing units (GPU) and specialized ASIC devices.

Types of mining systems: GPU vs. ASIC

Understanding the differences between these two approaches is critically important for choosing the right strategy.

GPU systems offer flexibility: operators can mine dozens of different cryptocurrencies depending on market conditions and efficiency. When the profitability of one coin drops, it’s easy to switch to another. The downside is higher energy consumption compared to ASICs and accelerated component wear.

ASIC devices are narrow-specialized machines optimized for a specific hashing algorithm. For example, an Antminer S21 delivers a power of 200 TH/s with a consumption of 3.5 kW, significantly outperforming any GPU configuration in the same price range. However, if the protocol changes, such a device loses its commercial value.

Anatomy of a mining farm: key components

To build a functional system, several critical elements must be balanced:

Computing units. In GPU farms, these are graphics cards (NVIDIA RTX 3070, RTX 3090, and similar). In ASIC solutions — specialized chips integrated into the device case.

Power supply and distribution. Modular PSUs with a capacity of 1200–1500 W for GPUs and 3–4 kW for ASICs ensure stable power. Insufficient capacity immediately leads to reboots and loss of profit.

Heat dissipation. A mining farm generates significant heat. GPUs require active ventilation and good air circulation, while ASICs often need industrial air conditioning systems.

Motherboard and communications. GPU farms require motherboards with multiple PCIe slots to connect several cards simultaneously. ASICs need only a network cable and power supply.

Software and monitoring. Farm management is carried out through specialized platforms to control temperature, overclocking, and redistribution of hashrate between pools.

Profitability dependence on local tariffs

Electricity costs remain the most critical factor. With current Ukrainian tariffs of 3.2–3.6 ₴/kWh, an Antminer S21 consumes about 9–10 thousand ₴ per month just on electricity.

Calculation for a specific example:

  • Daily income from Antminer S21 at market parity: 400–700 ₴
  • Daily energy costs: approximately 302 ₴
  • Net profit: 100–350 ₴/day

This means equipment costing 170,000 ₴ pays off within 1.5–4.5 years. A GPU configuration with 6 cards (150,000 ₴) shows even worse figures with a payback period of 3–5 years.

Practical steps to launch your own system

The process is not limited to purchasing equipment. It involves a phased implementation:

Planning and budgeting. The starting threshold for enthusiasts is 40–60 thousand ₴ (1–2 GPUs), for a serious project — 150–250 thousand ₴. ASIC-class setups require at least 170 thousand ₴ per device.

Choosing and acquiring hardware. Clearly define: GPUs provide adaptability, ASICs — energy efficiency. Beginners often mistake saving on quality, leading to unpredictable repair costs.

Infrastructure integration. Motherboard, PSU, cooling system, and cabling must work harmoniously. Neglecting this leads to downtime.

Software setup and optimization. Modern mining platforms allow managing device operation, controlling temperature regimes in the range of 65–75 °C for GPUs and up to 80 °C for ASICs, automating overclocking, and reducing power consumption by 10–20% without losing hashrate.

Testing and calibration. The setup phase takes at least 2–4 weeks, including real-time monitoring and parameter adjustments.

Choosing a location: technical and social factors

The location of a mining farm directly affects operational costs and legal status.

Home option is attractive for beginners due to simplicity but has limitations. ASICs produce noise over 70 dB, equivalent to a vacuum cleaner. Typical home electrical wiring often cannot handle the load of several devices.

Separate premises (garage, warehouse) allow deploying the system without compromises on ventilation and noise protection. Costs include rent, cable infrastructure, and security systems.

Data centers for miners offer a “turnkey” service: specialists manage equipment, provide cooling, and security. A fee of 5–10% plus industrial electricity tariffs (3.2–3.6 ₴) reduce margins but remove administrative burdens.

Main risks and challenges in 2025

Energy instability. Electricity tariffs are considered a constant in calculations, but the danger of rising tariffs is real. An increase of 0.5 ₴/kWh significantly narrows profitability.

Physical wear of equipment. Fans, thermal paste, capacitors fail after 6–12 months of continuous operation. Preventive maintenance is a mandatory expense.

Market volatility. Fluctuations in Bitcoin and altcoin prices directly impact profitability. During sudden price drops, a farm can operate at zero profit for months.

Legal environment. The “Virtual Assets” law in Ukraine is in the implementation phase, leaving the sector in a gray zone. Income legalization requires registration as an individual entrepreneur or other legal status.

Public perception. During energy crises, high-consuming mining complexes are viewed critically. Documented cases of disconnection of facilities with excessive energy consumption exist.

Conclusion

Building a mining farm in 2025 is not just buying a few devices but a comprehensive project involving detailed planning, risk management, and continuous optimization. Success depends on choosing the right equipment type, skilled setup, and a realistic understanding of payback periods. New participants should start with small volumes — one or two units — to gain practical experience before scaling up.

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)