According to Tokyo Electric Power Company, the Fukushima Daiichi Nuclear Power Station resumed treated water discharge operations on June 11, after a system alert caused an automatic halt the previous day. The alert was triggered during treated water transfer operations on June 10 at 4 p.m. local ti